General Information

  • Location:  San Antonio, Texas  | Blanco Road & Loop 1604
  • Owner:  Bexar County
  • Engineer: CP&Y
  • Contract Amount: $32 million
  • Start Date: March 2009
  • Finish Date:  February 2011
  • General Description:  Infrastructure improvements consisting of roadway improvements, bridges, water lines, sanitary sewer, electric and natural gas facilities within four mile corridor to convert an existing two-lane facility to a four-lane divided roadway.  Part of a multi-phased improvement project funded by TXDOT and administered by Bexar County.

 

Key Points:

  • Construction in heavily congested urban areas.
  • 10,000 linear feet of 24” natural gas.
  • 5,000 linear feet of 6” natural gas.
  • 50,000 cubic yards of rock excavation.
  • 5,000 linear feet of water lines.
  • 98,000 tons of hot-mix asphalt.